TEFLON COATING REMOVAL - new_ITM_foundation

Go to content

Main menu

TEFLON COATING REMOVAL

NEWS

TEFLON COATING REMOVAL

This operation can be carried out for the tubes from 1" to 16" and also for pipes over 24" to over 35" using the machine suitable to those found in "MODELS" by installing the tool holder and suitable tool.

MB 130- range 35 - 132 mm - int ( da 1.1/4" a 5" est )
Tubo 4" sch. 40 (114,3 sp.6,02mm)

 
 

The machines are designed and built according to the UNI EN ISO 12100: 2010 and CE marked
We are certifying the company with "The management system certificate ISO 9001 -2008"

Back to content | Back to main menu